Introduction of Aluminum Template System
Material: 6061-T6 6063-T6
Bearing capacity:60KN/m2
Weight:25-30kg/m2
Hardness:about 13webster
Color:silver white
Surface: coated by isolation layer
Four Major Aluminum Template Systems
Template System:
To constitute the closed surface desired for concrete structure construction and ensure the forming of construction structure in concrete pouring.
Accessory System:
To connect single pieces of templates into a whole system, as connecting template member.
Support System:
To play a supporting role in the process of concrete structure construction and ensure floors, beam bottoms and cantilevered structures to be held steadily.
Fastening System:
To guarantee the width dimensions of structured formed by templates and ensure no template deformation, expansion or explosion in the process of concrete pouring.
Products details
1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum
7. no need for rehabilitation, no risk of rust and corrosion
8. fast installation owing to its special design
9. speed of construction-4-days each floor construction cycle.
10. Formwork can be re-used over 300 times.
11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.
System Characteristics
System Characteristicshigh standardization, lightweight, strong bearing capacity, high matching accuracy, disassembly convenience, large plate surface, less joints, good stability, long service life, more circulation times, recyclability, good economic benefits and high recovery value.
Analysis on Standard Five-day Construction Period
1) Day 1:Measure, lay off, bundle wall rebars and complete water and electricity performing and embedding
2) 07:00-12:00 in Day 2:Remove wall boards of lower level and transfer to the upper level for installation of wall column template
3) 14:00 in Day 2 - 18:00 in Day 3:Remove wall boards of lower level and transfer to the upper level for installation
4) 07:00-15:00 in Day 4:Bundle beam rebars, erect cantilevered structures for template construction, and adjust and strengthen wall column templates
5) 15:00 in Day 4 - 15:00 in Day 5:Bundle floor slab rebars and alternate water and electricity performing and embedding
6) 15:00-17:00 in Day 5:Clean the floor, recheck dimensions and prepare for concrete pouring
7) 17:00-23:00 in Day 5:Concrete pouring
Our Service
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
• Working time: 8:30am - 6:00pm, Monday to Friday.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question
main component
|
Wall Board:Main component of wall board column surface, consisting of standard and non-standard boards |
Inner Bend:Main component connecting boards at wall corners |
Wall End Plate (WEP):Component at wall end, which is required to align with the floor slab in installation |
Inner Bend:Main component connecting boards at wall corners |
End Beam (EB):Material used to connect boards, mainly installed at each end positions of floor slab |
Beam PlateJoining plate between wall surface and wall surface end plate cover |
Beam Soffit (BSL)Joining component between wall board and floor slab |
Intermediate BeamMaterial for board connection, to be installed between two neighboring floor slabs |
Slab Connector (SC) Joining material between wall board and floor slab |
Slab Outer Bend (SO) Outer joining component between wall board and top plate |
Bottom Corner Plate:Connecting wall boards for removal convenient, to be fixed with nuts at the bottom of plate in installation |
Connecting Strip:Auxiliary material used for installation of MB and EB with support head |
Slab Inner Bend (SI)Inner joining component between wall board and top plate |
Crown Stay:Support to hold the weight of floor slab in the process of concrete pouring and casting |
Round Pin and Wedge Pin:To connect wall board and surface plate |
Buckle:For horizontal fixing at corrugated joints |
Flat Steel BarConsumable used to maintain certain space (wall thickness) between surface plates |
Bushing:Made of PVC, used when flat steel bar protectors are required on the wall board or the back of wall board. It plays the role of protection by putting flat steel bar into the bushing |
Wall BoltAccessory used to fix internal and external wall boards and prevent wall boards from deformation |
Square Tube HookAlternate material used to fix horizontal bending parts when many surface plates are required to install on the wall |
Advantages of Aluminum Template in Technical Indicators |
Item |
Wood Template |
Small Steel Template |
Large Steel Template |
Heavy Steel-Frame Plywood Template |
Light Steel-Frame Plywood Template |
Aluminum Alloy Template System |
Material of Plate |
12-18mm-thick plywood |
2.3-2.5mm-thick steel plate |
5-6mm-thick steel plate |
18mm-thick steel plate |
15mm-thick plywood |
4mm-thick aluminum profile |
Thickness of Template (mm) |
12-18 |
55 |
86 |
120 |
120 |
65 |
Weight of Template (KG) |
10.5 |
35-40 |
80-85 |
56-58 |
40-42 |
18-22 |
Bearing Capacity (KN/m2) |
30 |
30 |
60 |
60 |
50 |
45-60 |
Times of Circulation (Times) |
5 |
100 |
250 |
200 |
150 |
300 |
Degree of Difficulty in Construction |
Easy |
Comparatively easy |
Difficult |
Difficult |
Easy |
Easy |
Maintenance Cost |
Low |
Comparatively low |
High |
High |
High |
Low |
Construction Efficiency |
Low |
Low |
Comparatively high |
Low |
Comparatively high |
High |
Application Scope |
Walls, columns, beam slabs and bridges |
Foundation, walls, columns and beam slabs |
Walls |
Walls, columns, beam slabs and bridges |
Walls, columns, beam slabs and bridges |
Walls, columns, beam slabs and bridges |
Concrete Surface Quality |
Rough surface |
Rough surface, with low precision |
Clean and smooth, reaching requirements of general as-cast concrete |
Clean and smooth, reaching the requirements of finishing and as-cast concrete |
Clean and smooth, reaching the requirements of finishing and as-cast concrete |
Clean and smooth, reaching the requirements of finishing and as-cast concrete |
Recovery Value |
Low |
Medium |
Medium |
Low |
Low |
High |
Dependence on hoist (Yes/No) |
No |
No |
Yes |
Yes |
Yes |
No |